REALLY BIG NEWS! The Tahoe-Pyramid Trail “Floriston Section” is NOW FULLY OPEN 10/5/19 Read the amazing recent press about this beautiful new section of the Tahoe-Pyramid Trail (Floristan/Hogback Trail Segment of the Hirschdale to Verid Trail Section): (opens in a new tab)” href=”https://tahoepyramidtrail.org/wp-content/uploads/KOLOTV_10-03-19.pdf” target=”_blank”>Read the KOLO TV Press Release for the Floriston Trail Section (PDF) READ FULL POST >
TPT Volunteers Install New Trail Signage
Volunteers have installed four of five kiosks with new information signs along the trail in the canyon. There will be a total of five installed when the project is complete. A large kiosk with 4′ X 4′ panel has been installed at the east end of Hirschdale road. Three 24″ x 36″ small kiosk have READ FULL POST >
Work Begins on the Floriston/Hogback Trail Section
The Tahoe-Pyramid Trail Building contractor and advisors will be construction on the final link of the one-mile section in May 2019. This “final section” of the Truckee Canyon (Hirschdale to Verdi) will complete this section of the trail and remove the problematic detour around Floriston that included a section that included forced travel on the READ FULL POST >